Manufacturing & quality assurance

This overview explains how we think about traceability and inspection - it is not a substitute for a facility audit or third-party surveillance report.

Workflow (generic)

  1. Incoming steel inspection and release
  2. Forming / welding hold points per WPS
  3. Surface preparation and coating application under qualified procedures
  4. Holiday detection, thickness checks, and peel/adhesion tests as specified
  5. Final documentation bundle for release
Quality inspection with clipboard in a factory (illustrative stock photo)

ISO 9001 / ISO 14001 / ISO 45001 families are referenced on Baike as part of the management system posture - display official certificates only after client approval.

Program gates (illustrative)

Horizontal timeline for RFQ-to-release storytelling—dates are placeholders, not delivery promises.

RFQ

Line list, standards, and inspection regime captured.

Tech review

Coating build, hold points, and submittals agreed.

Melt / plate

MTC alignment to grade and heat strategy.

Coating

Surface prep, application, cure per procedure.

Inspection

Holiday, thickness, adhesion per ITP.

Release

Documentation bundle + packing list.

Video placeholder: no hosted walkthrough yet—add a short loop only after you have rights-cleared factory footage and a compressed poster frame.

Welding operations (stock)

Pipe making & welding

Illustrative only; publish verified equipment lists separately.

Pipe storage yard (stock)

Finished goods protection

Bevel protection, dunnage, and sea-fastening follow the contract packing list.

Industrial inspection scene (stock)

Inspection & release

Holiday detection, thickness, and adhesion tests per ITP and invoked standards.